RIIMPO324F Conduct Civil Construction Grader Operations
Outcome: Nationally recognised statement of attainment
Course Duration: 1-3 days (experience, competency and class size dependent)
RPL Assessment only: Or approx. 6-8 hours, if a logbook with at least 40 hours detailing experience can be provided and verified
Location: Onsite or offsite, statewide (Grader and suitable practical training area to be provided by the client)
Pre-requisites: Must be 16 years of age and possess good language, literacy and numeracy skills
What to bring: USI Number (https://www.usi.gov.au/students/create-your-usi). Biscuits, tea, coffee and drinks are provided. There are many takeaway food options nearby or feel free to bring your own lunch
PPE requirements: Safety boots, long pants and Hi Vis short/long sleeve shirt
Unit Descriptor
-
Plan and prepare for grader operations
-
Operate grader in line with established requirements to complete work activity
-
Select, remove, fit and use attachments for grader
-
Prepare to relocate the grader
-
Conduct housekeeping activities
Application of the Unit
This unit describes the skills and knowledge required to conduct grader operations.
This unit applies to those working in site based roles.
Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors, and must be sourced from state jurisdictions prior to applying this unit.
This unit alone does not provide sufficient skill to independently load and unload equipment. To perform this activity safely, personnel must either complete or be assisted by someone who has completed RIIHAN308F Load and Unload Plant or equivalent. This unit describes a participant’s skills and knowledge required to conduct civil construction grader operations in Civil construction.
This unit is appropriate for those working in operational roles.
Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.